Greenfield 230-69kV Substation
SECo provided full-service engineering and design for the construction of a greenfield 230-69kV substation, featuring two 230-69kV transformers, double-bus double-breaker configuration for the 230kV portion of the yard, and breaker and a half configuration for the 69kV portion of the yard.
Project Included:
-
Two (2), 170MVA, 230-69kV Power Transformers
-
Two (2) Station Service Transformers
-
Four (4) 230kV, 3000A Circuit Breakers
-
Eight (8) 69kV, Circuit Breakers (6-2000A, 2-3000A)
-
Ten (10) Motor Operated Disconnect Switches
-
Fourteen (14) Manually Operated Disconnect Switches
-
CCVTs, PTs, and Surge Arresters
-
Six (6) Dead End Structures, A Frame
-
Ten (10) Dead End Structures H Frame
-
Disconnect, Bus Support, CCVT, PT, and Surge Arrester Structures
-
Design for New Control House and Relay Panels, AC and DC Distribution Panels, Relays etc.
-
Trench and Conduit
-
Yard Grounding
-
Yard lighting and Lightning Protection
-
All Associated Foundations