34.5/138V Collector and Step-Up Substation
SECo performed full-service engineering for the 34.5/138kV collector and step-up substation. It has 20 WTG of 2.5MW and an annual production of 121 GW.




1/8
Quick Links
bottom of page

SECo performed full-service engineering for the 34.5/138kV collector and step-up substation. It has 20 WTG of 2.5MW and an annual production of 121 GW.