34.5/138V Collector and Step-Up Substation
SECo performed full-service engineering for the 34.5/138kV collector and step-up substation. It has 20 WTG of 2.5MW and an annual production of 121 GW.
New Substation Consists Of:
-
138kV Breaker
-
139kV Metering
-
Three (3) 138kV Disconnect Switches
-
Two (2) 138kV DeadEnd Structures
-
138kV Power VT for Station Service
-
16' x 36' Metal Control Building
-
Control Cables
-
Panels and Equipment
-
SCADA
-
Telephone Service
-
Associated Facilities